A smart hands technician can only work with what’s in front of them. When a visit fails, it’s almost always because of something that should have been in the work order: no access to the comms room, equipment that hadn’t arrived, nobody available to confirm the result. Each failed visit means paying for a second one.
This checklist covers what a good work order includes. It applies to any smart hands or field-service provider, not just us. Print it, copy it into your ticket template, or send it to whoever writes your dispatches.
1. Site
The technician has to find the right door at the right time.
- Site name or store number, full street address and postal code
- Where on site the work is (room, floor, rack, ceiling area)
- Opening hours, and the permitted work window
- Parking, loading dock or freight elevator details
- Any site rules: safety gear, escorts, photo restrictions, union or landlord requirements
2. People and access
A locked comms room is the most common reason a visit fails.
- On-site contact name and phone number, and a backup
- How the technician checks in (front desk, manager, security)
- Keys, access cards, alarm codes or lockbox details for restricted areas
- Your remote engineer’s name and number for the duration of the visit
- Escalation contact if neither answers
3. Scope
Write it so someone who has never seen the site can do it.
- What needs to be done, step by step where it matters
- Device names, models and locations, with photos or diagrams if you have them
- Which ports, circuits or cable runs are involved
- What the technician should NOT touch
- Expected duration, and whether overtime is pre-approved
4. Equipment and materials
The second-most-common reason for a revisit.
- What is being shipped, by whom, and the tracking numbers
- Where it will be waiting on site, and who signed for it
- What the technician must bring (tools, cable, consumables, test gear)
- What happens to removed equipment: return, recycle or leave on site
- Return shipping labels, if needed
5. Remote support
Most installs end with someone remote confirming it works.
- Whether your engineer will configure remotely, and how to reach them
- Any credentials or console access the technician needs (sent securely)
- Network details: which switch port, VLAN or IP, if relevant
- How long the technician should wait for remote confirmation
6. Definition of done
Agree what “finished” means before anyone is on site.
- The test that proves it works (device online, ping, transaction, camera view)
- Who signs off: your remote engineer, the site manager, or both
- What to do if it can’t be completed: partial completion, escalate, or stop
7. Documentation
If it isn’t photographed, it didn’t happen.
- Required photos: before, after, labels, rack, serial numbers
- Test results or certification reports (for cabling)
- Serial numbers of installed and removed equipment
- Where and in what format the closeout package should be sent
8. Admin
Saves a round of emails afterwards.
- Your ticket or PO number to quote on the invoice
- Approved budget or not-to-exceed amount
- Whether the technician represents your brand (white-label) or theirs
After the visit
Check the closeout package the same day while the technician still remembers the site. Note anything that went wrong and add it to your template for next time.
Sending work to Canada? Smart Hands Canada handles single visits and multi-site rollouts across the country, with photo-documented closeout on every job. Get a quote.